If you have searched for Pearl Lake City or Tumaria Dam recently, you are not alone. Pearl Lake City is a large lake tourism destination planned around the Tumaria Dam reservoir near Kashipur in Uttarakhand. The idea is simple: bring the kind of holiday that families now fly to Dubai, Singapore or Phu Quoc for, to a lake that is about three and a half hours from Delhi.
Where it is
Tumaria Dam, also written Tumria Dam, sits near Maldhan Chaur in Udham Singh Nagar district. Kashipur is about 23 km away, and Ramnagar, the gateway to Jim Corbett National Park, is about 19 km away. Delhi to Kashipur is about 230 km by road. The nearest railway station is about 7 km from the dam, and Pantnagar airport serves the region.
What is planned
The master plan places 23 experiences around one lake, across about 100 acres in six zones:
- Lakefront and icons: Pearl Riviera Town, Moti Kiss Bridge, the Jal Tarang light show, the SkyPearl Ropeway across the lake, the Venezia Gondola Canal, island hopping, the Royal Pearl Cruise and Pearl Wedding Lawns.
- Water and indoor: AquaVerse Water Park, Wonder Kingdom, Deep Blue Aquarium, the Ocean Tunnel Walk, Himalaya Snow World and the Sangeet Musical Fountain.
- Streets and culture: Pearl Grand Plaza, Chandni Night Bazaar, Vishwa Gram, Bloom Valley Gardens and Swad Global Food Street.
- Nature and adventure: Corbett Wild Trails, the Terai off-road trail, SkyPearl Balloons and the Jungle Zipline.
Around the lake, nine theme resorts are planned, from Bali-style pool villas to Rajasthani havelis and glass glamping domes.
Why here
The Corbett belt already draws visitors for tiger safaris. The newer Phato zone alone drew 36,984 tourists in FY 2024-25, and the Hathi Dagar zone opened in March 2024. What the region lacks is a place that keeps a family busy for two or three full days. Pearl Lake City is planned to fill that gap: safari at dawn, a water park by day and a cruise and fountain show by night.
When will it open?
Pearl Lake City is at the planning stage. Approvals, the detailed project report and design are expected to take about two years. The first phase is planned to open at the end of Year 3, and the full project to be built in about seven years across four phases. Lake activities will start only after permission from the irrigation and forest departments.
How to follow the project
The official website, pearllakecity.com, carries the master plan, the activity list, the theme resort options and an enquiry form for investors, landowners and partners. You can also write to info@pearllakecity.com.
Images shared for Pearl Lake City are illustrations of the planned project.
